What is the method of operating the gas generator to shut down the entire station?
1. Gas outages after power outages, water outages and other accidents at gas stations should be carried out in accordance with regulations.
2. A planned station-wide gas outage should be carried out according to the following procedures:
1. Call together rescue personnel and other functional personnel to study and formulate a shutdown plan, confirm the gas shutdown time and notify users.
2. When the gas stops, notify the user to close the furnace front valve and burner, and open the respective relief valves.
3. Turn the gas generator to cold standby, close the coal gate of the generator, stop the air supply and power filter, increase the supply of saturated steam, and open the bell valve to release.
4. Stop the discharge conveyor and blower, open the steam purge valve of the electric filter, and open the discharge pipes of each department.
5. Start the conveyor to purge the entire plant pipeline with air, and then stop purging when the samples taken from the plant pipelines pass the test.
6. Release the accumulated water in the water jacket, steam drum, etc., stop the operation of the instrument, and stop the discharge and delivery of the machine.
Please indicate the source when reprinting:
http://www.cngrjx.com